General Contractor: BUDIMEX SA

 

(formerly: Construction of the Olsztyn bypass in the course of the national road No. 16: Task No. 2: from km approx. 10+000 to the end of the study at km approx. 24+701 (after the Olsztyn - Wschód interchange)), together with the connection with the existing DK16 at the designed km of the bypass at 26+040. The Richert company executed a section of length 5.6 km, from km approx. 15+000 - 20+600.The project in question included the construction of a section of the bypass with a two-lane section, together with the construction of service roads, the repair of selected local roads, the construction of engineering structures and environmental protection equipment. As part of the contract, the following were built:

 

Olsztyn Jaroty junction which is the connection of the bypass with the designed provincial road No. 598.

 

While at the beginning of 2017, an annex to the Agreement was signed covering also the construction of the Pieczewo Junction in the course of the S51 road, (full cloverleaf) and its connection with the existing national road 53.The detailed scope of the task includes the construction of 8 junctions of the junction with a total length of 2.5 km, a section of national road 53 with a length of about 2.3 km from the junction of the tasks of the General Directorate for National Roads and Motorways and the City of Olsztyn to the existing national road 53. As part of the investment, we completed the following tasks:

 

*Earthworks:

● removal of humus layer -266,000 m3

● excavation of trenches- 658,000 m3

● excavation of non-bearing soil- 395,000 m3

● execution of embankments- 520,000 m3

● execution of overburden embankment or working platform- 27,000 m3

● execution of GWW,GWN layer- 146,000 m3

● execution of G3/G4 mattress layers of 0/31.5 and 0/63 crushed aggregate, 25 cm thick- 171,000 m3

 

*Construction works:

● sub-base layer of unbound mix 0/31.5 – 845,800 m2

● technological layer of unbound mixture 0/22.4 – 533,400 m2

● drainage layer of unbound mix 0/22.4 – 834,840 m2