Construction of the underground part of the Łódź Fabryczna railway station intended for check-in and reception of trains and service for travelers, reconstruction of the road system and infrastructure around the multimodal Łódź Fabryczna railway station - construction of an integrated transfer node above and below Węglowa Street
General Contractor: NLF Torpol Astaldi s.c.
A very important project on the map of our realizations. It was the third largest railway station investment in Europe at the time of reconstruction. The largest contract executed by us outside of Northern Poland. It should be emphasized that we performed substructure excavations reaching up to 20m below ground level. During the contract, we hauled nearly one million cubic meters of earth from the city center (from the construction site). We started the work in January 2014 and completed it in June 2015 As part of the contract, we performed, among other things:
● subgrade excavation of 924,395 m3
● open excavations of 46,104 m3
● narrow space excavation 38,600 m3