General Contractor: Torpol S.A.
In March 2022, intensive work carried out by Richert on the most important railroad investment in the capital of Warmia and Mazury - the Land of a Thousand Lakes - began. In the near future, the Olsztyn railroad station, together with the entire adjacent infrastructure, will change beyond recognition. It will thus ensure comfort, safety and efficient connection for all travelers. The contract includes the modernization of the track and platform system over a length of almost 5 kilometers .
Earthworks carried out on the project site:
● demolition of the substructure,
● excavations and embankments,
● ground reinforcement: stabilization - soil replacements,
● subgrade profiling,
● incorporation with profiling of the protective layer,