S-5 on the section Nowe Marzy - Bydgoszcz

Design and construction of S-5 expressway on the section Nowe Marzy - Bydgoszcz - border of kujawsko-pomorskie and wielkopolskie voivodships, divided into 4 parts: Part 2 - Design and construction of S-5 expressway on the section from Tryszczyn junction (without junction) to Białe Błota junction (without junction) with a length of about 13.5 km

 

General Contractor: Polaqua Sp. z o.o.

 

The construction of S5 is one of the major projects being carried out outside our province. The S5 expressway will connect the A1 highway in Nowe Marzy with the A2 highway near Poznań. Seven of the nine sections with a total length of almost 130 kilometers are currently under construction. All of them in Kujawsko-Pomorskie. The other two connecting to Poznań, in Wielkopolska province, were built several years earlier. Part of the route from Poznań to Wrocław is also under construction.

 

The earthworks performed by us are:

● construction of the road system of expressway no. 5

● construction of the Bydgoszcz Zachód interchange

● reconstruction of cross roads

● construction of access roads

● dehumusings

● excavations (approx. 500,000 m3)

● embankments (approx. 500,000 m3)

● ground reinforcement by soil replacement (approx. 150,000 m3).

● ground reinforcement by chemical stabilization